Gallery
To review our recent projects, simply use the scroll down facility.
Alternatively if you have a particular interest in one of our sectors, click on
the specific sector link on the right hand of this page.
![]() |
|
ALTERATIONS AND EXTENSION: BOOSTER STATION, ARNISH, ISLE OF LEWIS All of the works will be carried out on a live electrical power generation site. MMA were responsible for the design and will carry out a Supervisory role during its construction. |
|
![]() |
|
NEW WORKSHOP & STORAGE FAILITIES: INVERNESS Additional civil works also included the development of a sustainable solution to the containment of potential oil discharges from the stored plant and machinery within the site. |
|
![]() |
|
OIL CONTAINMENT: VARIOUS SITES Sites designs to date include sub-stations at Lochearnhead, Milton of Balgonie by Dundee, Arnish on the Isle of Lewis, Lochcarnan on South Uist, Glencoe (Highlands), Insh in Aberdeenshire, Kinloss (Morayshire) and Glendevon. |
|
![]() |
|
REMEDIAL WORKS: LOCHCARNAN, SOUTH UIST |
|
![]() |
|
BIO-REMEDIATION REDEVELOPMENT OF SOLSGIRTH, ALLOA MMA worked up and agreed a remediation strategy with SEPA, and the Local Authority’s Environmental Health Officer, and provided a full time site presence monitoring its implementation. The work involved identifying and removing 3000m³ of hydrocarbon contaminated soil for on-site bioremediation; emptying and backfilling 1·5 hectares of disused iron contaminated minewater settlement ponds; stabilising two abandoned mine units; and preparing foundation designs for cost effective site development. |
|
![]() |
|
STRUCTURAL DESIGN: OUR DYNAMIC EARTH, EDINBURGH |
|
![]() |
|
STRUCTURAL DESIGN: ASPIRE CENTRE, CARNEGIE COLLEGE |
|
![]() |
|
CIVIL & STRUCTURAL DESIGN: FMC TECHNOLOGIES, DUNFERMLINE |
|
![]() |
![]() |
CIVIL & STRUCTURAL DESIGN: DEDRIDGE RETAIL PARK, LIVINGSTON Following on from this MMA were novated to the Design and Build Contractors to erect a new B&Q warehouse on one of the plots. |
|
![]() |
|
STRUCTURAL DESIGN: PROCLAD, GLENROTHES The tank was sunk some 3m below the existing floor level and adjacent to the foundations and columns to the portal frame superstructure. |
|
![]() |
|
CIVIL & STRUCTURAL DESIGN RUGBY STORE, CAVALRY PARK, PEEBLES Our remit included the structural, roads and drainage designs. In addition to this, the site of the unit lay on an area of the River Tweed floodplain and our remit therefore required the provision of suitable floodplain compensation measures. The unit itself was constructed from a steel portal frame, clad in profiled sheeting - with brick facing dado walls - and reinforced concrete ground and mezzanine floors. |
|
![]() |
|
STRUCTURAL DESIGN, CDM CO-ORDINATOR: CITY QUAY, DUNDEE The development comprises 73 units with the existing buildings and new build 6 storey apartments. The flats, formed in a steel frame provide a prominent feature to the waterfront skyline. Project Engineer, David Hunt, said that one of the main issues that had to be addressed was the variability of the existing buildings with walls proving to be neither parallel, nor plumb! The Client for the project Unicorn Property Group, for whom we are currently working on a further £2.5m waterfront project to convert the historic clock tower building into luxury flats. |
|
![]() |
|
INVERLEITH PLACE EDINBURGH
|
|
DELIVERING HIGH QUALITY CIVIL & STRUCTURAL ENGINEERING SOLUTIONS |
|